Modlniczka
The project of implementing nature-based solutions (NBS) at Futura Park / Factory Kraków includes the change of up to 57 tall trees in the car park, a 500m2 green wall of climbing plants, 2,240m2 of wildflower meadows, species-enrichment of the embankment, and shading walls with climbing plants and rain gardens with a capacity of 112m3 along the pedestrian walkway.
They are designed to intercept part of the rainwater flowing from the parking lot before it goes to the rainwater sewage system. They were located in places where there are no underground networks and near rainwater drainage inlets due to the ease of making emergency overflows.
We are designing a green wall on the glass facade, exposed to the south side. It is a mesh substructure dedicated to climbers.
To create shaded path from the parking lot to the terminals, we design pergolas overgrown with ivy over the pedestrian crossings.
We design flower meadows in places where it is not technically possible to construct rain gardens and where waterproof surfaces can be dispensed with.
przesuń w prawo lub lewo
What results have we obtained?
We have designed rainwater gardens with a capacity of 112 m³
We have provided shaded parking spaces by planting 57 tall trees in the car park.
We have covered 500 m² of the south-facing faCade with climbing plants.
We have converted 2,240 m² of lawns into flower meadows.